Homeowner-side technical oversight

Your upgrade.
Your project manager.

GreenWave can coordinate your grant-supported heat-pump project, compare technical proposals, inspect key stages and keep the evidence organised—while each installer remains directly responsible for its own work.

Request project support

Choose the level of help

Support matched to your project

No contractor receives your details without your authorisation. The €35.67 paid Preparation Pack price (€29 excluding VAT) is credited when you appoint GreenWave within 30 days.

Planning

Grant Guidance

€299
including VAT · paid on appointment

For homeowners managing their own contractors.

  • Grant route and document plan
  • One quotation review
  • 45-minute consultation
  • Handover document checklist
  • Up to 2.5 hours of GreenWave time
€35.67 paid pack credit available
Coordination

Project Coordination

€995
including VAT · three payment stages

GreenWave keeps the people, documents and decisions moving.

  • Everything in Guidance
  • Compare up to three quotations
  • Coordinate up to three contractors
  • Variations and payment-stage tracking
  • Up to 8 hours over 4 months
€395 · €300 · €300
Accountant review pending: prices currently include VAT provisionally and remain subject to GreenWave's written quotation. No payment is taken when requesting a scope review.
How it works

One controlled path from idea to handover

1PrepareGrant case, property readiness and agreed project scope.
2AppointDirect homeowner contracts with competent, insured trades.
3ControlDesign review, hold points, snags and written variations.
4ProveCommissioning evidence, safety file, warranties and BER.
Inspection gateWhat GreenWave records
Pre-start and designGrant approval, appointments, insurance, heat loss, emitters, hydraulics, electrical and DHW design.
First-fix and plantAccessible pipework, insulation, valves, penetrations, drainage, clearances, protection and service access.
Pre-commissioningFlushing, pressure testing, water quality, filtration, filling, wiring, sensors and readiness evidence.
CommissioningFlow, temperatures, delta-T, controls, weather compensation, DHW, balancing, alarms and homeowner demonstration.
Completion and follow-upSnags, certificates, warranties, safety file, grant documents, post-works BER and initial performance review.

Clearly priced additional support

Anything outside the signed package is agreed in writing before it is charged.

€110/hourAdditional project-management time
€299Additional scheduled inspection
€229Contractor-caused reinspection
€75Each quotation beyond three
€125Each additional contractor
€195/monthBeyond the included project period

Normal GreenWave travel supplements apply to physical visits. Larger whole-home or multi-trade projects are individually scoped and are not included within the €2,495 package.

Clear responsibility

Coordination does not remove contractor responsibility.

The homeowner appoints each works contractor directly. Contractors remain responsible for their design, workmanship, materials, safety, damage, certificates and warranties.

GreenWave’s role

We coordinate, review submitted evidence, attend agreed inspection stages, record findings and advise the homeowner.

Roles not silently accepted

GreenWave is not SEAI, an SEAI One Stop Shop, the installer, designer, PSDP or PSCS unless separately appointed in writing with suitable competence and insurance.

Request a scope review

Tell us what level of support you need

Start the free Grant Navigator first. It creates the secure grant case needed for this project workspace.

Before appointment: GreenWave will review the scope, contractor arrangements and its insurance position. Submitting this form does not appoint GreenWave or authorise construction work.